Workspace · Beta

Audit-ready QR asset tracking for labs, R&D, and industrial teams.

Multi-tenant workspaces bucketed by your corporate email domain. Immutable action log. Saved templates for repeatable lab workflows. Print, peel, stick, scan, with a permanent paper trail your inspectors can read.

TLS 1.3RLSDomain-locked seatsAppend-only log
Not for regulated data. StickyLink Workspace is in beta and does not yet carry SOC 2, HIPAA, ISO 27001, PCI, or FedRAMP certifications. Do not store PHI (protected health information), payment card data, classified information, ITAR-controlled data, or clinical-trial records subject to 21 CFR Part 11. See the compliance roadmap.

Built for institutions

Audit-ready features organized by what your team actually needs: controlled access, traceable assets, governed documents, and portable data.

Access & Governance

Who gets in, what they touched, and what stays retained.

  • Anyone with a @yourcompany.com email joins your workspace. First user becomes org admin; new members arrive as pending until approved.

  • Every create, view, update, and archive is logged with timestamp, user, IP, and object ID. Rows cannot be edited or deleted, enforced at the database.

  • Retention-friendly by default. Deletions are recorded as archive events; historical data stays queryable for auditors.

Asset Tracking

Turn physical stickers into a single source for bench and floor assets.

  • "Lab Notebook Page", "Equipment Calibration Sheet", "Reagent Log". Scan a blank sticker and instantly apply a standard schema.

  • Assign 20 stickers to one asset (e.g. "Freezer #4, shelf 3"). Any scan resolves to the same dynamic page.

  • Reagents, consumables and spares carry a counter on the tag. Whoever scans adjusts it in two taps, and every asset keeps its calibration due date, certificates and maintenance history in one scannable record.

Document Control

Controlled documents with a revision trail and a QR stamp on every copy.

  • Generate a log for any documentation folder: every document with its current revision and code, plus scope, purpose and supervisor sign-off lines. Printable and scannable.

  • A lightweight review pass catches spelling and grammar and tightens vague operator wording. Suggestions are applied one at a time by the author, never automatically.

  • Print, download, or email a document and StickyLink stamps a claimed QR code in the corner of every page. Scan the paper copy to land on the live record and confirm you're holding the current revision, no separate sticker to apply.

Data & Export

Get your data out in the formats compliance teams already expect.

  • Configure column layouts per template. Export the full asset roster and audit trail as a spreadsheet.

  • Download every create, view, update and archive event as a timestamped CSV with actor, IP, object ID and delta for binder or LIMS import.

  • Map StickyLink fields to your existing columns. Export in your team's format so imported data lands in the right place without manual retyping.

Two ways teams run Workspace

Same stickers, same audit log, same org. Pick the depth of record your team needs, and move up when you need controlled documents.

Track 1 · Labs & R&D

Track what's on the bench

Reagent counts, instrument QA, notebook pages, sample custody. Scan, read, adjust, export. Runs on Secure Workspace at $99/mo.

See the lab workflows
Track 2 · Manufacturing engineering

Run controlled documents

Travelers, setup sheets, and work instructions with step sign-off, redline diffs, e-approval before release, and numbered revisions. Every printed or emailed copy is stamped with its own QR code, so paper on the floor scans straight back to the current release. Adds the Document Suite at $249/mo.

See the shop-floor workflows
Track 1 · Labs & R&D, Secure Workspace

What a scan does on the bench

Four concrete workflows lab teams run on StickyLink. Every action lands in the append-only audit log with actor, timestamp, and IP.

Inventory
Workspace recordLive
Workspace sticker · member view

Tris-HCl buffer 1M

Lot L-8827 · Exp 2027-04 · bench A3
Quantity on hand
24
+
Audit log
09:41 qty set → 24 jkim@acme.bio
Append-only · permanent

Scan a bench sticker, tap +/− to adjust vial quantity. Every change writes to the append-only audit log with the scientist's email.

Compliance
Workspace recordLive
Workspace sticker · member view

Daily QA · HPLC #2

Template · run 2026-08-20
Pre-run checklist
  • Warm-up cycle complete
  • Calibration standard within ±2%
  • Detector baseline stable
  • Sample tray clean
Calibration certificate
hplc-02-cal-2026.pdf
Audit log
09:47 checklist 0/4 jkim@acme.bio
Append-only · permanent

Whoever runs QA scans the instrument sticker and checks items on their phone. The calibration cert is one tap away as a PDF field.

Notebook
Workspace recordLive
Workspace sticker · member view

Exp 14 · flow-cell setup

Aug 3 · run by jkim@acme.bio
Setup photos
Rig · wide
Schematic
Close-up
Linked analysis
exp-14-raw.xlsx calibration-log
Audit log
11:12 page opened jkim@acme.bio
Append-only · permanent

Stick a QR in your paper lab notebook. Scan it to open setup photos and live links to the analysis spreadsheet, no camera-roll hunt.

Custody
Workspace recordLive
Workspace sticker · public

Batch 2026-07 · vial 3391

Study SL-104 · frozen −80°C
Chain of custody
Immutable entries1 recorded
Released by
jkim
Received by
rlee
Condition
Sealed
By jkim10:02
New handoff entry
Add entry

Append-only · entries are permanent and audited

Hand off a sample between team members by scan. Export the immutable log as CSV for the study binder or LIMS import.

Track 2 · Manufacturing engineering, Document Suite

Controlled documents on the shop-floor tablet

Same stickers, deeper records. Routed travelers with step sign-off, setup sheets with tooling and attachments, and the manufacturing instruction editor with revision control, redline diffs and e-approval before release. Downloads are flat PDFs, so the editable master always stays in StickyLink, and every page header carries a claimed StickyLink QR code, so a printed traveler on the floor scans back to the live record and its current revision.

Traveler, released
StickyLink Workspace aal2
Logo
Work Order Traveler

Housing bracket, 4821-002

Rev C · Released
E7K2QM
Work order
WO-4821
Part number
4821-002
Rev
C
Qty
12 / 25
Author
R. Ortiz
MaterialPart numberLot / heat #Qty
6061-T6 bar, 1.25 in4821-RAW-01HT-442103
Anodize, clear Type II4821-FIN-02AN-9931-
Loctite 2434821-ADH-03L-708821
OP#StepOperationsReference imageInitialsDate
Section A, Material prep
10Kit & verify stockPull 6061-T6 bar per BOM. Verify heat lot vs. cert. Record lot # below.photoRO09/07/26
20Saw to lengthCut 3.10 in ±0.03. Deburr saw edge. Stage in blue bin at Cell 4.photo
Section B, Machining
30CNC rough, Op AHaas VF-2, fixture B, G54. Run program O4821-A. First article to QA.photo
40Deburr & inspectBreak all edges .005–.015. Inspect Ø.501 +.001/-.000 with pin gage.photo
Section C, Release
50Final QA + cert uploadComplete dimensional report. Attach material cert PDF. Sign to release.photo

Tap a row to sign. Initials and date are captured against your logged-in account and written to the immutable audit log.

Operators sign off each operation by scan. Steps lock in order and every signature lands in the append-only audit log.

Setup sheet
StickyLink Workspace aal2
Logo
Setup Sheet

Op 20, fixture B setup

Rev B · Released
S1P8RD
Machine
Haas VF-2
Document
SETUP-118
Rev
B
Author
R. Ortiz
MaterialPart numberLot / heat #Qty
Fixture B, pallet 2FIX-4821-B-1
6061-T6 blank, sawed 3.10 in4821-RAW-01HT-442102
1/2 flat EM, .250 drill, chamfer millTOOL-KIT-118-1
#InstructionReference imageTime / date
Section 1, Machine prep
1Power on Haas VF-2, home all axes, verify air at 90 psi.photo07:04 · 09/07/26
2Load fixture B on pallet 2, torque clamps to 25 ft-lb.photo07:11 · 09/07/26
3Clean locating pads, confirm no chips under stock.photo
Section 2, Tooling & offsets
4Load T1 1/2 flat EM, T4 .250 drill, T7 chamfer mill.photo
5Set G54 X/Y from probe routine PROBE-118.photo
6Touch off Z on stock top, record offsets in control.photo
Section 3, First article
7Single-block first part at 25% feed. Send to QA before running.photo

Each check stamps the operator, time and date. Initials and date columns are an opt-in setting when a step needs a signature.

Offsets, tooling, speeds and feeds beside the fixture photo and probe routine, one scan at the control.

MI edit view
StickyLink Workspace aal2
← Back
MI-207 · Adhesive cure
Document editor · what you see is what prints
ReviewPrint
Logo
Manufacturing instruction

MI-207, Adhesive cure · Draft

L92XKD
Work order
4821
Part number
4821002
Rev
3 (draft)
All changes saved.
OP#StepOperationsReference imageInitialsDate
Section A, Bond prep
10
+ Photo
20
+ Photo
Section B, Cure
30
+ Photo

Authoring mode: edit step names, operations and reference photos. Save keeps a working revision, Release freezes a numbered version.

Edit the instruction, save a revision while you iterate, then release a numbered version with a permanent read-only share link. An assisted review pass flags spelling, grammar and vague operator wording, you apply the suggestions line by line, nothing is rewritten behind your back.

Asset tag, scanned
StickyLink Workspace aal2
Logo
Equipment record

Asset tag · CTF-0042

E7K2QM
Asset ID
100042
Serial
991233
Rev
B
Record details
Asset
Thermo Sorvall ST8 centrifuge
Location
Bldg 2 · Lab 214 · bench C
Owner
Analytical services
Calibration due
2026-11-04
Last PM
2026-05-19 · Vendor #88214
Status
In service
Runs since last service, editable by whoever scans
132runs · flags PM at 250 · every change is logged with user and time
Attached documents
  • Operating manual (PDF)
  • IQ/OQ qualification packet (PDF)
  • Calibration certificate, Rev 4 (PDF)
  • Work instruction WI-212 (link)
Date
Maintenance log
By
2026-05-19
Preventive maintenance, brushes, balance check
Vendor
2026-02-02
Rotor lot swapped, imbalance alarm cleared
J. Ruiz
2025-11-14
Annual calibration, passed
Metrology

One sticker on the instrument. Manuals, qualifications, calibration certificates, inventory counts and the maintenance history all live behind it.

One asset tag holds the manual, IQ/OQ qualification, calibration certificate, work instruction, live consumable count and the full maintenance history. Whoever scans can adjust the count or add the next service entry, all of it timestamped.

Recurring · SaaS

Secure Workspace

$99/ month per organization
or $990/year, two months free
  • • Up to 5 members within your corporate domain
  • • Immutable, paginated audit log, full history retained
  • • Multi-QR asset mapping & Excel export
  • • Live inventory counts & maintenance/calibration logs
  • • Automatic maintenance & calibration due-date reminders
  • • Build your own custom templates (not just the standard set)
  • • Cancel anytime, workspace stays read-only
Start workspace
Recurring · Best value

Document Suite

$249/ month · 5 seats included
or $2,490/year, two months free
  • • Everything in Secure Workspace
  • • 5 included seats + $40/mo per extra seat
  • • Custom templates built with StickyLink
  • • Document editing, revision control & release
  • • Nested folders for documentation
  • • Assisted review: spelling, grammar & vague-wording flags
  • • AI autofill from an uploaded PDF, Excel, doc or photo
  • • Print, download PDF & email records
  • • Tablet/computer travelers & setup sheets
Start Document Suite